Operational Efficiencyv1
Manufacturing Cycle Time
The total time required to convert raw materials into finished goods.
Owner: Unassigned
Updated: 10/30/2025
Calculation Formula
ENGLISH
Process Time + Move Time + Inspection Time + Queue TimePython Example
If the total time from start to finish for a product is 8 hours, that is the cycle time.Entity Applicability
Which business entities use this KPI
Standard Calculation
8 of 8 entities
100%
Entity-Specific Notes
Shorter cycle times improve responsiveness to customer demand and reduce working capital tied up in inventory.
Entity List (8)
MENA-01•Dubai Terminal
EU-02•Hamburg Terminal
HQ•Headquarters
ASIA-02•Hong Kong Terminal
EU-01•Rotterdam Terminal
ASIA-01•Singapore Hub
US-01•US East Terminal
US-02•US West Terminal
Additional Information
Industry
Heavy ManufacturingTags
Heavy Manufacturing
Status
activeLocal Network
Data Quality Dependencies
Critical DQ dimensions for this KPI
Accuracy
highThe degree of closeness of data values to real values.
Critical for Manufacturing Cycle Time accuracy and reliability
Completeness (Data values)
highThe degree to which all required data values are present.
Critical for Manufacturing Cycle Time accuracy and reliability
Timeliness
highThe degree to which the period between the time of creation of the real value and the time that the dataset is available is appropriate.
Critical for Manufacturing Cycle Time accuracy and reliability
Uniqueness (Records)
highThe degree to which records occur only once in a data file.
Critical for Manufacturing Cycle Time accuracy and reliability
Quick Stats
DQ Dependencies4
Applicable Entities8/8
Versionv1
API Access
GET /api/kpis/manufacturing-cycle-time