Asset Reliabilityv1

Equipment Reliability Factor

Ratio of actual productive time to planned production time for equipment.

Owner: Unassigned
Updated: 10/30/2025
Calculation Formula
ENGLISH
(Actual Operating Time / Planned Operating Time) * 100
Python Example
Equipment operating 180 hours out of planned 200 hours has 90% reliability.
Entity Applicability
Which business entities use this KPI
Standard Calculation
8 of 8 entities
100%
Entity-Specific Notes

Combines availability and performance into single reliability metric.

Entity List (8)
MENA-01•Dubai Terminal
EU-02•Hamburg Terminal
HQ•Headquarters
ASIA-02•Hong Kong Terminal
EU-01•Rotterdam Terminal
ASIA-01•Singapore Hub
US-01•US East Terminal
US-02•US West Terminal
Additional Information
Industry
All
Tags
All
Status
active
Local Network
Data Quality Dependencies
Critical DQ dimensions for this KPI
Accuracy
high

The degree of closeness of data values to real values.

Critical for Equipment Reliability Factor accuracy and reliability

Completeness (Data values)
high

The degree to which all required data values are present.

Critical for Equipment Reliability Factor accuracy and reliability

Timeliness
high

The degree to which the period between the time of creation of the real value and the time that the dataset is available is appropriate.

Critical for Equipment Reliability Factor accuracy and reliability

Validity
high

The degree to which data values comply with rules.

Critical for Equipment Reliability Factor accuracy and reliability

Quick Stats
DQ Dependencies4
Applicable Entities8/8
Versionv1
API Access
GET /api/kpis/equipment-reliability-factor