Changeover Time
Time required to switch production line from one product to another.
Owner: Unassigned
Updated: 10/30/2025
Calculation Formula
ENGLISH
End of Last Good Part (Product A) to First Good Part (Product B)Python Example
If it takes 45 minutes to switch from producing Product A to Product B, changeover time is 45 min.Entity Applicability
Which business entities use this KPI
Standard Calculation
8 of 8 entities
100%
Entity-Specific Notes
Shorter changeover times enable greater production flexibility and responsiveness.
Entity List (8)
MENA-01•Dubai Terminal
EU-02•Hamburg Terminal
HQ•Headquarters
ASIA-02•Hong Kong Terminal
EU-01•Rotterdam Terminal
ASIA-01•Singapore Hub
US-01•US East Terminal
US-02•US West Terminal
Additional Information
Industry
Heavy Manufacturing, CPGTags
Heavy ManufacturingCPG
Status
activeLocal Network
Data Quality Dependencies
Critical DQ dimensions for this KPI
Accuracy
highThe degree of closeness of data values to real values.
Critical for Changeover Time accuracy and reliability
Completeness (Data values)
highThe degree to which all required data values are present.
Critical for Changeover Time accuracy and reliability
Timeliness
highThe degree to which the period between the time of creation of the real value and the time that the dataset is available is appropriate.
Critical for Changeover Time accuracy and reliability
Quick Stats
DQ Dependencies3
Applicable Entities8/8
Versionv1
API Access
GET /api/kpis/changeover-time