Operational Efficiencyv1

Changeover Time

Time required to switch production line from one product to another.

Owner: Unassigned
Updated: 10/30/2025
Calculation Formula
ENGLISH
End of Last Good Part (Product A) to First Good Part (Product B)
Python Example
If it takes 45 minutes to switch from producing Product A to Product B, changeover time is 45 min.
Entity Applicability
Which business entities use this KPI
Standard Calculation
8 of 8 entities
100%
Entity-Specific Notes

Shorter changeover times enable greater production flexibility and responsiveness.

Entity List (8)
MENA-01•Dubai Terminal
EU-02•Hamburg Terminal
HQ•Headquarters
ASIA-02•Hong Kong Terminal
EU-01•Rotterdam Terminal
ASIA-01•Singapore Hub
US-01•US East Terminal
US-02•US West Terminal
Additional Information
Industry
Heavy Manufacturing, CPG
Tags
Heavy ManufacturingCPG
Status
active
Local Network
Data Quality Dependencies
Critical DQ dimensions for this KPI
Accuracy
high

The degree of closeness of data values to real values.

Critical for Changeover Time accuracy and reliability

Completeness (Data values)
high

The degree to which all required data values are present.

Critical for Changeover Time accuracy and reliability

Timeliness
high

The degree to which the period between the time of creation of the real value and the time that the dataset is available is appropriate.

Critical for Changeover Time accuracy and reliability

Quick Stats
DQ Dependencies3
Applicable Entities8/8
Versionv1
API Access
GET /api/kpis/changeover-time